Facing brickwork all this week. Up to 1.8 the whole way around now, minus 2 course on the front. Blockwork to start Monday with insulation (full fill) in between the 100mm cavity. Scaffold will be going up all around Thur. Truss delivery is expected on the 14th. The pitch is to low to bother with a cut roof or attic trusses.
Have included a pic of the new manhole on the front, still minus lid. From here the run goes into an existing manhole which i'm still yet to take a photo of.