Plans

Plans
Layout & Elevations (must upload better quality)

Sunday, 17 June 2012

End of Week 19

I have now made a list of all the remaining jobs inside. Crossed a few off already but when they're all crossed off the house is done. Dropped kerb to be done infront of the drive (possibly after BT connect) then ready to be signed off by building control.

Plumber just has to connect gas and sign off then he's done. Bathroom is fitted but I forgot to take a pic. Dimensions worked out well.

The List Is-

Kitchen

-silicone bottom of plinths and w/top joint with tile splashback.
-pelmet around boiler housing (after electrician and plumber)
-tile below boiler housing
-Silicone door threshold to floor.

Bed 1

-Shelf put into wardrobe (after it's been glossed)
-Chrome hanging rail underneath
-Threshold at door (after carpet)

Bed 2

-Both shelves into wardrobe (after glossing)
-Chrome hanging rails underneath each
-Threshold as bed 1
-RH cupboard door plane more clearance
-Bedroom door as above

Bathroom

-Tiling to finish around WC, bath and mosaics upto shower frame.
-Silicone shower enc, bath and wall to floor tile joints.
-Chrome towel rail above rad
-Chrome loo roll holder
-Mirror?
-Tighten shower riser rod

Lounge n/a

Hall

-Celotex ontop of loft hatch (done)
-Plastic trim at bot front door
-Silicone door threshold to floor.

Gloss painting still to be done and a good clean then that's it...


BT duct trench
Kitchen